Programme design
Uttar Pradesh’s Solar Pump Scheme is the state arm of the Government of India’s PM-KUSUM programme, implemented by the UP New & Renewable Energy Development Agency (UPNEDA). Component-B finances stand- alone off-grid solar pumps for un-electrified or poorly-served tube-well farmers; Component-C solarises existing grid-connected feeders. Capacity menu is 3 / 5 / 7.5 / 10 HP DC and AC; the effective farmer share is typically ~30 % after central MNRE subsidy (60 %) and UP state top-up (10–30 %).
Benefit structure
- ~70 % blended subsidy = 60 % MNRE (PM-KUSUM Component-B) + 10–30 % UP state top-up (varies by capacity and category).
- Capacity menu: 3 HP, 5 HP, 7.5 HP, 10 HP DC/AC pumps with corresponding solar PV array.
- Effective farmer contribution typically ~30 % of project cost.
- Operation cost zero or negligible compared to diesel pumps; effective payback under 5 years on water-extraction value alone.
- SC / ST / women / SMF beneficiaries may enjoy higher state-top-up tier; verify the latest GO.
Eligibility
- UP farmer with own borewell or tube-well land.
- Registered on UPNEDA portal during the seasonal notification window.
- UP Bhulekh khatauni land record.
- Aadhaar-seeded bank account.
- Caste certificate (for SC/ST quota where applicable).
- Not already grid-connected with a running power tariff for the same tube-well (PM-KUSUM Component-B targets unelectrified pumps).
How to apply — step by step
- Register on upneda.org.in during the open notification window (typically announced district-wise).
- Select capacity (3 / 5 / 7.5 / 10 HP), AC or DC; pay the farmer-contribution token.
- Upload UP Bhulekh khatauni, Aadhaar, bank passbook, borewell certificate / tube-well details and caste certificate (if applicable).
- District selection committee allocates the pump against the notified district quota.
- UPNEDA assigns an empanelled EPC vendor; pump and array installed at the farmer’s borewell.
- District inspection committee certifies installation; subsidy adjusted against the farmer’s effective contribution.
Latest changes (2024 — 2026)
- 2024: UP scaled PM-KUSUM Component-B allocation; UPNEDA enrolled thousands of new pumps across the eastern and western UP belts.
- March 2025: upneda.org.in registration and selection moved fully online; AgriStack Farmer ID integration piloted.
- August 2025: Capacity menu retained; EPC vendor empanelment refreshed.
- 2025-26: Exact FY 2025-26 pump- installation outlay not published as of 2025-26 — figures tabled in UP Vidhan Sabha replies. Centre and state continue to share PM-KUSUM cost.
Common rejection reasons + appeal
- Already grid-connected tube-well: Component-B targets unelectrified pumps; grid- connected pumps look at Component-C instead.
- UP Bhulekh mismatch: khatauni-owner name differing from Aadhaar — remediate at the tehsil office.
- Borewell certificate missing: tube- well or borewell details required for capacity sizing.
- District quota exhausted: notification quota for the season is filled; re-apply next notification window.
- EPC vendor off-panel: only empanelled EPC vendors are authorised.
- Farmer contribution unpaid: token contribution must be paid at registration.
- Aadhaar — bank seeding failure: DBT credit fails on NPCI side.
Grievance: District UPNEDA officer → UPNEDA Project Director → Department of Additional Sources of Energy, UP. Written appeal within 30 days. PIB releases on PM-KUSUM and PM-KUSUM scheme dashboards at MNRE provide national context.
How UP Solar Pump stacks with other schemes
UP Solar Pump is the state implementation of PM-KUSUM (central). Convergence with PMKSY-PDMC (micro-irrigation), Atal Bhujal Yojana (groundwater management — particularly in over- exploited blocks where solar pumps need pairing with drip / sprinkler), PMKSY-HKKP (Har Khet Ko Pani) and PMKSY-AIBP. PM-KISAN, KCC-MISS and PMFBY continue at individual- farmer level. UP-specific schemes for cane payment and krishak durghatna run in parallel.
Coverage statistics
Per UPNEDA dashboards and UP CM Office press notes, the state has installed tens of thousands of PM-KUSUM Component-B solar pumps cumulatively. Exact FY 2024-25 and FY 2025-26 installation, capacity and outlay figures are tabled in UP Vidhan Sabha replies and MNRE PM-KUSUM dashboards.