State scheme · Uttarakhand

Mukhyamantri Saur Swarojgar Yojana

मुख्यमंत्री सौर स्वरोजगार योजना

ActiveMSYLaunched 2020 · Uttarakhand Renewable Energy Development Agency (UREDA)
Benefit
70% subsidy
25 kW grid-connected solar plant with up to 70% subsidy (MNRE central + UREDA state share); balance via bank loan with 4% interest subvention
Apply on msy.uk.gov.in

Eligibility

  • Eligible: Uttarakhand resident rural youth
  • Eligible: reverse migrant
  • Eligible: farmer
  • Eligible: Age 18 or above

Documents required

  • Aadhaar
  • Uttarakhand permanent resident certificate
  • Land record (own or notarised lease ≥25 years)
  • Bank account
  • Project DPR + bank loan sanction

Quick facts

Key facts about this scheme
Launched2020
Implementing ministryUttarakhand Renewable Energy Development Agency (UREDA)
Application portalmsy.uk.gov.in (opens in new tab)
StatusActive

Programme design

Mukhyamantri Saur Swarojgar Yojana is Uttarakhand’s self-employment scheme that links the state’s reverse-migration challenge (post-COVID return of youth to hill villages) with renewable-energy capacity addition. The scheme finances grid-connected rooftop / land-mounted solar plants of 25 kW capacity per beneficiary, with the generated power purchased by UPCL (Uttarakhand Power Corporation) at a notified PPA tariff. The blended subsidy of up to 70 % (MNRE central component + UREDA state share) combined with a bank loan covers the project capex.

Benefit structure

  • 25 kW solar plant — rooftop or land- mounted, grid-tied.
  • Up to ~70 % subsidy blended from MNRE central plus UREDA state share (subsidy mix varies by year and category).
  • 30 % balance through bank term loan with 4 % interest subvention.
  • Power Purchase Agreement (PPA) with UPCL at notified tariff (~₹2.5–3.5/unit; verify the latest UERC tariff order).
  • Project capex order of ~₹15 lakh; effective farmer equity after subsidy and loan is modest.

Eligibility

  • Resident of Uttarakhand with valid permanent resident certificate.
  • Rural youth, reverse migrant or farmer aged ≥18 years.
  • Owns land or holds a notarised lease of ≥25 years (to match PPA tenure).
  • Aadhaar-seeded bank account and bank-loan sanction in principle.
  • Project DPR aligned with UREDA technical guidelines.

How to apply — step by step

  1. Visit msy.uk.gov.in during the open notification window.
  2. Submit Aadhaar, Uttarakhand permanent resident certificate, land record (owned or notarised lease ≥25 years), bank account, project DPR and bank-loan sanction letter in principle.
  3. UREDA appraises the DPR; sanction order issued with empanelled-EPC vendor list.
  4. Beneficiary executes EPC contract; project is constructed and commissioned within 6–9 months.
  5. UPCL signs the PPA; meter is commissioned; UPCL credits monthly power-sale revenue.
  6. Subsidy is released back-end against bank loan, reducing the principal; interest subvention is adjusted quarterly.

Latest changes (2024 — 2026)

  • 2024: PPA tariff revised by UERC; scheme rollout expanded to additional hill districts with reverse-migrant priority.
  • March 2025: msy.uk.gov.in online sanction flow rolled out; vendor-empanelment refreshed.
  • August 2025: Convergence with PM-KUSUM Component-A (grid-connected) for higher capacity additions where land permits.
  • 2025-26: Exact FY 2025-26 outlay not published as of 2025-26 — figures tabled in Uttarakhand Vidhan Sabha replies.

Common rejection reasons + appeal

  • Land tenure short of 25 years: lease shorter than 25 years cannot meet PPA tenure.
  • DPR technical mismatch: DPR not aligned with UREDA technical spec or grid-evacuation availability.
  • Permanent resident certificate missing: Uttarakhand domicile is mandatory.
  • EPC off-empanel: non-empanelled EPC vendor disqualifies the subsidy.
  • Grid evacuation infeasible: hill- distribution feeder unable to absorb 25 kW — site is sent back for re-evaluation.
  • Aadhaar — bank seeding failure: DBT credit fails on NPCI side.

Grievance: District UREDA officer → UREDA Project Director → Department of Energy Uttarakhand. msy.uk.gov. in hosts a grievance redressal tab.

How Saur Swarojgar stacks with other schemes

MSY is the hill-area renewable-livelihood rail. Convergence with PM-KUSUM Components A and C (grid-connected solar and feeder- level solarisation), Pirul (pine-needle bio-fuel) for biomass complement and UREDA’s legacy off-grid solar programmes. KCC-MISS and PMFBY operate at farmer level independent of MSY.

Coverage statistics

Per Uttarakhand CM Office press notes, MSY has sanctioned several thousand units since launch with installed capacity in the multi-MW range. Reverse- migrant participation is publicly tracked on UREDA dashboards. Exact FY 2024-25 and FY 2025-26 sanction and commissioning figures are tabled in Uttarakhand Vidhan Sabha replies.